A 550,000 square foot distribution center damaged by the collapse of a 30'X100' section of roof resulting from heavy thunder storms, and the subsequent flooding due to a broken fire suppression system and rainwater intrusion. First Response was there to mitigate the loss and prevent additional damage to the flooded offices. Through the use of rapid drying technology the warehouse was at 80% operational capacity in 24 hours and fully functional in two days.